Structex worked alongside DLA to complete the staged construction to ensure the operational side of the airport could continue with minimal disruption to passengers. The works consisted of a new baggage collection area, modern décor, upgraded entrances and exits, and ablutions. The strengthening and extension integrates new structural steel seamlessly into the existing building elements.