The complex was relocated in 2014 to a prominent corner site alongside the Avon River to make way for the re-construction of permanent buildings – further fulfilling the fundamental motivations of the project.
Design Features:
• Fast-tracked programme of 3 months for detailed design, approvals and construction
• Future-proofed design of the container modifications allows for reconfiguration and further modification of the container buildings to accommodate future sites
This project received an ACE NZ Innovation Award of Excellence Merit Award in 2013.